Dungeness Off-Channel Reservoir Design

Since the 30% design open house in December 2022, a LiDAR investigation revealed potential fault lines (lineaments) near the planned reservoir footprint. In order to ensure feasibility of design and location, a further seismic investigation is being conducted. In addition to this seismic investigation, the County has received feedback from residents concerned about the embankment height and amount of water above ground level in the 30% design. In response to these two factors, the 30% design is currently being revised, and current alternative designs can be viewed below.